Toutes les méthodes
StrategyDébutant

Stakeholder Map

A strategic tool for identifying, categorising, and planning engagement with all people and groups affected by or influential in a project or change. The classic format is a 2x2 matrix with axes of Power (influence over the outcome) and Interest (degree of stake in the outcome). Placement in the matrix guides how to engage each stakeholder: manage closely, keep informed, keep satisfied, or monitor.

Durée
30m–1h
Taille du groupe
2–15 people
Matériel
whiteboard or large paper, sticky notes, markers
Source
Community

Comment l'animer

  1. 1

    Draw a 2x2 matrix: x-axis = Interest (low → high), y-axis = Power/Influence (low → high).

  2. 2

    Label the four quadrants: High Power/High Interest = 'Manage Closely'; High Power/Low Interest = 'Keep Satisfied'; Low Power/High Interest = 'Keep Informed'; Low Power/Low Interest = 'Monitor'.

  3. 3

    Brainstorm all stakeholders — individuals, groups, organisations — on sticky notes.

  4. 4

    Place each stakeholder in the appropriate quadrant. Discuss and challenge placements.

  5. 5

    For each High Power/High Interest stakeholder: define a specific engagement strategy.

  6. 6

    Identify gaps: who is missing from the map? Who has been overlooked?

  7. 7

    Review and update the map as the project evolves.

Conseils

  • Stakeholder maps go out of date quickly — update them at major project milestones.

  • The most dangerous quadrant is High Power/Low Interest — a disengaged powerful stakeholder can block a project unexpectedly if they become unhappy.',

Variantes

Add a third dimension: attitude (supporter/neutral/blocker) represented by arrow direction. Create an engagement plan matrix as a companion document.

Contextes d'utilisation

Project planningChange managementPolicy developmentProduct launches

Questions fréquemment posées

Quand utiliser Stakeholder Map ?â–ľ

Utilisez Stakeholder Map lorsque vous souhaitez: Project planning; Change management; Policy development; Product launches.

Combien de temps dure Stakeholder Map ?â–ľ

Stakeholder Map dure généralement 30–60 minutes.

Pour combien de participants Stakeholder Map convient-il ?â–ľ

Stakeholder Map fonctionne mieux pour des groupes de 2–15 participants.

De quels matériaux ai-je besoin pour Stakeholder Map ?▾

Pour animer Stakeholder Map, vous aurez besoin de : whiteboard or large paper, sticky notes, markers.

Quel est le niveau de difficulté de Stakeholder Map ?▾

Stakeholder Map est classé débutant — facile à animer même sans expérience préalable.

🪡

Planifiez votre prochain atelier avec l'IA

Workshop Weaver vous aide à combiner des méthodes comme Stakeholder Map en un agenda complet et minuté en quelques minutes.

Essayer gratuitement

Method descriptions on Workshop Weaver are original content written by our team, based on established facilitation practices.

Stakeholder Map — Facilitation Method | Workshop Weaver