Toutes les méthodes
IdeationIntermédiaire

Assumption Storming

A structured exercise for surfacing and evaluating the hidden assumptions underlying a plan, strategy, or product idea. Participants list all the assumptions the plan depends on, then map them by importance (how critical is it if this is wrong?) and certainty (how confident are we this is true?). High-importance, low-certainty assumptions are the critical risks to test.

Durée
30m–1h
Taille du groupe
2–20 people
Matériel
sticky notes, markers, 2x2 matrix (importance vs. certainty)
Source
Community

Comment l'animer

  1. 1

    Present the plan, strategy, or product concept.

  2. 2

    Ask: 'What must be true for this to work?' Have everyone silently write assumptions on sticky notes (5 min).

  3. 3

    Share assumptions and cluster similar ones.

  4. 4

    Draw a 2x2 matrix: x-axis = certainty (low → high), y-axis = importance (low → high).

  5. 5

    Plot each assumption on the matrix.

  6. 6

    Focus attention on the top-left quadrant: high importance, low certainty. These are your riskiest assumptions.

  7. 7

    Design experiments or research to validate or invalidate the riskiest assumptions before committing.

Conseils

  • Teams often confuse opinions with assumptions.

  • An assumption is something that hasn't been proven yet.

  • Push back on 'We know users want this' — do you actually know, or is that an assumption?

Variantes

Run a 'Leap of Faith' variant (from Lean Startup) focused only on the two most critical assumptions to test. Add a third axis (testability) to prioritise which assumptions you can actually test quickly.

Contextes d'utilisation

Product discoveryBusiness model validationStrategy risk assessmentLean startup experiments

Questions fréquemment posées

Quand utiliser Assumption Storming ?â–ľ

Utilisez Assumption Storming lorsque vous souhaitez: Product discovery; Business model validation; Strategy risk assessment; Lean startup experiments.

Combien de temps dure Assumption Storming ?â–ľ

Assumption Storming dure généralement 30–60 minutes.

Pour combien de participants Assumption Storming convient-il ?â–ľ

Assumption Storming fonctionne mieux pour des groupes de 2–20 participants.

De quels matériaux ai-je besoin pour Assumption Storming ?▾

Pour animer Assumption Storming, vous aurez besoin de : sticky notes, markers, 2x2 matrix (importance vs. certainty).

Quel est le niveau de difficulté de Assumption Storming ?▾

Assumption Storming est classé intermédiaire — une certaine expérience en facilitation est utile.

🪡

Planifiez votre prochain atelier avec l'IA

Workshop Weaver vous aide à combiner des méthodes comme Assumption Storming en un agenda complet et minuté en quelques minutes.

Essayer gratuitement

Method descriptions on Workshop Weaver are original content written by our team, based on established facilitation practices.

Assumption Storming — Facilitation Method | Workshop Weaver