RACI Matrix — clarifying roles responsibilities in projects
All methods
FacilitationIntermediate

RACI Matrix

A RACI Matrix clarifies roles and responsibilities within a project by identifying who is Responsible, Accountable, Consulted, and Informed for each task. This structured approach helps reduce ambiguity and ensures everyone understands their contributions to the project.

Duration
1h–2h
Group size
2–6 people
CCBY-SA 4.0

How to run it

  1. 1

    Prepare two lists: a work breakdown and a list of roles.

  2. 2

    For the work breakdown, list specific tasks or activities that need to be addressed.

  3. 3

    For roles, use titles that represent groups of tasks, like 'Project Manager' or 'Designer'.

  4. 4

    Draw a matrix with the work breakdown on the vertical axis and the roles on the horizontal axis.

  5. 5

    Assign responsibility levels (R, A, C, I) for each task in the matrix through group discussion.

  6. 6

    Ensure everyone agrees on the assignments and understands their roles.

Tips

  • Encourage open discussion to foster clarity and buy-in from all participants.

  • Regularly revisit the matrix as the project progresses to ensure relevance.

  • Use visual aids to enhance understanding and engagement during the session.

Variations

You can adapt the matrix for larger teams by using subgroups or software tools for virtual collaboration.

Where it fits

team kickoffproject planningrole clarificationstakeholder alignmentworkflow development

Related methods

Frequently asked questions

When should I use RACI Matrix?

Use RACI Matrix when you want to: team kickoff; project planning; role clarification; stakeholder alignment; workflow development.

How long does RACI Matrix take?

RACI Matrix typically takes 60–90 minutes.

How many participants does RACI Matrix work for?

RACI Matrix works best for groups of 2–6 participants.

What materials do I need for RACI Matrix?

RACI Matrix requires no special materials — just participants and a space.

How difficult is RACI Matrix to facilitate?

RACI Matrix is rated intermediate — some facilitation experience is helpful.

🪡

Plan your next workshop with AI

Workshop Weaver helps you combine methods like RACI Matrix into a complete, timed agenda in minutes.

Try it free

Method descriptions on Workshop Weaver are original content written by our team, based on established facilitation practices. This method was inspired by work from SessionLab. Licensed under CC BY-SA 4.0.