Todos los métodos
Team BuildingPrincipiante

9 Dimensions Team-Building Activity

The 9 Dimensions activity is designed to foster connections and enhance trust within a team. Participants explore various aspects of themselves and share insights with others, building a deeper understanding.

Duración
20m–1h
Tamaño del grupo
3+ people
Materiales
A copy of the 9 Dimensions worksheet for each participant
CCBY-SA 4.0

Cómo ejecutarlo

  1. 1

    Distribute the 9 Dimensions worksheets to each participant.

  2. 2

    Give participants time to fill out their worksheets individually.

  3. 3

    Organize participants into small groups to discuss their insights.

  4. 4

    Encourage sharing of key takeaways and reflections within the groups.

  5. 5

    Bring everyone back together for a larger group discussion.

  6. 6

    Facilitate a debrief focusing on themes and understanding from the group.

Consejos

  • Create a safe environment for sharing to encourage openness.

  • Be mindful of time to ensure everyone can share their insights.

  • Encourage active listening during group discussions.

Variaciones

Consider using online versions of the worksheets for remote teams or adapting the dimensions to fit your team's specific needs.

Casos de uso

team kickoffretrospective closingtrust-building sessionicebreaker for new teamsteam development workshop
🪡

Planifica tu próximo taller con IA

Workshop Weaver te ayuda a combinar métodos como 9 Dimensions Team-Building Activity en una agenda completa y cronometrada en minutos.

Probar gratis

Method descriptions on Workshop Weaver are original content written by our team, based on established facilitation practices. This method was inspired by work from SessionLab. Licensed under CC BY-SA 4.0.

9 Dimensions Team-Building Activity — Facilitation Method | Workshop Weaver