Todos los métodos
EnergiserPrincipiante

Spaghetti Tower

A team challenge popularised by Tom Wujec where small groups have 18 minutes to build the tallest freestanding structure that can support a marshmallow on top — using only spaghetti, tape, and string. Despite its simplicity, it reliably generates powerful insights about collaboration, prototyping, iteration, and the failure of planning-heavy approaches. Business school graduates consistently perform worse than kindergarteners.

Duración
30m–45m
Tamaño del grupo
8–60 people
Materiales
20 sticks of dry spaghetti, 1 metre of tape, 1 metre of string…
Fuente
Community

Cómo ejecutarlo

  1. 1

    Divide participants into teams of 4–5 people.

  2. 2

    Give each team: 20 sticks of spaghetti, 1 yard of masking tape, 1 yard of string, 1 marshmallow.

  3. 3

    Rules: the marshmallow must be on top. The structure must be freestanding. The tape may be broken into pieces.

  4. 4

    Set a timer for 18 minutes. Begin.

  5. 5

    At 'stop', measure the height of each freestanding structure with the marshmallow on top.

  6. 6

    Debrief: 'What strategies worked? What failed? When did you first test the marshmallow? What does this tell us about prototyping and iteration?'

Consejos

  • The key insight is that kindergarteners beat business school grads because they iterate — they put the marshmallow on early and adjust.

  • Business grads plan, then discover at the last minute the structure can't support the weight.

  • Frame the debrief around this insight.',

Variaciones

Replace spaghetti with other materials. Add a constraint: one team member is 'the client' who can change requirements mid-build. Use as a leadership observation exercise.

Casos de uso

Team buildingInnovation workshop openersLeadership developmentTeaching iterative thinking
🪡

Planifica tu próximo taller con IA

Workshop Weaver te ayuda a combinar métodos como Spaghetti Tower en una agenda completa y cronometrada en minutos.

Probar gratis

Method descriptions on Workshop Weaver are original content written by our team, based on established facilitation practices.

Spaghetti Tower — Facilitation Method | Workshop Weaver