Todos los métodos
DecisionIntermedio

Pre-Mortem

Developed by psychologist Gary Klein, the Pre-Mortem asks teams to imagine that a project has already failed — then work backwards to identify what went wrong. By adopting a future failure mindset before starting, teams surface risks, blind spots, and assumptions they would otherwise overlook. It's one of the most effective ways to stress-test a plan.

Duración
30m–1h
Tamaño del grupo
3–20 people
Materiales
sticky notes, markers, whiteboard
Fuente
Community

Cómo ejecutarlo

  1. 1

    Present the plan or project to the group.

  2. 2

    Set the scene: 'Imagine it is one year from now. The project has failed — completely. What went wrong?'

  3. 3

    Give participants 5 minutes to silently write as many failure causes as they can think of.

  4. 4

    Each person shares their most important failure scenario.

  5. 5

    Cluster similar failure modes on the board.

  6. 6

    Discuss which risks are most likely or most impactful.

  7. 7

    Identify preventive actions for the top risks and assign owners.

Consejos

  • The failure framing is key — it grants permission to be pessimistic without being seen as a blocker.

  • Make it clear this is not about blame, it's about smart planning.

  • The facilitator should actively encourage the darkest scenarios.

Variaciones

Run a 'Pre-Parade' alongside it: 'Imagine the project succeeded beyond all expectations. What made it work?' This gives you both the risks and the success conditions.

Casos de uso

Project kick-offsStrategy planningProduct launchesMajor change initiatives
🪡

Planifica tu próximo taller con IA

Workshop Weaver te ayuda a combinar métodos como Pre-Mortem en una agenda completa y cronometrada en minutos.

Probar gratis

Method descriptions on Workshop Weaver are original content written by our team, based on established facilitation practices.

Pre-Mortem — Facilitation Method | Workshop Weaver